Bradford Solar PA / BRDFS
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 100.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-232b0085d1d9a8b042a9b482 |
| Net Summer Capacity (MW) | 100.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-232b0085d1d9a8b042a9b482 |
| Net Winter Capacity (MW) | 100.5 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-232b0085d1d9a8b042a9b482 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 68014 |
| Plant Name | Bradford Solar PA |
| Google Map | Map |
| Bing Map | Map |
| Plant State | PA |
| County | Bradford |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | BRDFS |
| Nameplate Capacity (MW) | 100.5 |
| Net Summer Capacity (MW) | 100.5 |
| Net Winter Capacity (MW) | 100.5 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 41.721657 |
| Longitude | -76.53663 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1290 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1013
Sources EV-0791444999d54da2321f5bafEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5051f82bc33723481caabd557a27fc0e661fdd8cb31212b526ada7f7241f5f8e
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1290
Sources EV-232b0085d1d9a8b042a9b482Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 fa027ef1ef6e1946b36a0867a488fa129665880f5161f0f695c310c0a3b7235f
Usage terms US government public domain