Bright Mountain Solar / BM1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 80 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-3d092266b3c28b6b6b27c123 |
| Net Summer Capacity (MW) | 80 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-3d092266b3c28b6b6b27c123 |
| Net Winter Capacity (MW) | 80 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-3d092266b3c28b6b6b27c123 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 15399 |
| Entity Name | Avangrid Power LLC |
| Plant ID | 67990 |
| Plant Name | Bright Mountain Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KY |
| County | Perry |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | BM1 |
| Nameplate Capacity (MW) | 80 |
| Net Summer Capacity (MW) | 80 |
| Net Winter Capacity (MW) | 80 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 37.29003 |
| Longitude | -83.28286 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1289 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:997
Sources EV-97d548ba5fac7a523ae60c9eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cbb73a294046d973de5490e4fa30c2b72ac18dc150631bfd59452e72f8717812
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1289
Sources EV-3d092266b3c28b6b6b27c123Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 eea8eb9043430b4335a675ff70d391308503b0d5d8dac6da9879d178e11da68e
Usage terms US government public domain
