Mystic Springs Renewable Energy (Hybrid) / MYSPS
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 250 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-8722b4b96954959ce1328384 |
| Net Summer Capacity (MW) | 250 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-8722b4b96954959ce1328384 |
| Net Winter Capacity (MW) | 250 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-8722b4b96954959ce1328384 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67987 |
| Plant Name | Mystic Springs Renewable Energy (Hybrid) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Kaufman |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | MYSPS |
| Nameplate Capacity (MW) | 250 |
| Net Summer Capacity (MW) | 250 |
| Net Winter Capacity (MW) | 250 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 3 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 32.821255 |
| Longitude | -96.19042 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1467 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:994
Sources EV-055fd176191414fd61e51636Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46e3492f3408ebbab7d3837ec07c038f4823b13b00b7bb527cf3b5a58858c702
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1467
Sources EV-8722b4b96954959ce1328384Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ad7cf8739af4a959034ee195ca42ee8a559d424588b85031c10002c5f386c0c2
Usage terms US government public domain
