Agave / A400M
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 150 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-34683c09b397cbe542522ad8 |
| Net Summer Capacity (MW) | 150 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-34683c09b397cbe542522ad8 |
| Net Winter Capacity (MW) | 150 MW | Original source column definition · Generator · (TS) Construction complete, but not yet in commercial operation As-of date 2026-08 Sources EV-34683c09b397cbe542522ad8 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 803 |
| Entity Name | Arizona Public Service Co |
| Plant ID | 67964 |
| Plant Name | Agave |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Maricopa |
| Balancing Authority Code | AZPS |
| Sector | Electric Utility |
| Generator ID | A400M |
| Nameplate Capacity (MW) | 150 |
| Net Summer Capacity (MW) | 150 |
| Net Winter Capacity (MW) | 150 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (TS) Construction complete, but not yet in commercial operation |
| Latitude | 33.32389 |
| Longitude | -112.8397 |
| Original text | (TS) Construction complete, but not yet in commercial operation |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:215 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:977
Sources EV-d13fc410ed61fea36d1cac17Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f4ee65bc40f5697f928c6247adc228f91c2cd095fcddf259952470d003053558
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:215
Sources EV-34683c09b397cbe542522ad8Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f5ec7c3e81fb8244d426af5d9fe04d24d8fec7b3e394c997b8cd4593b8b84e28
Usage terms US government public domain