Juniper Creek Storage / JCSIB
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-a746d0e4cd64743184dc501c |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-a746d0e4cd64743184dc501c |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-a746d0e4cd64743184dc501c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64545 |
| Entity Name | Vesper Energy Development LLC |
| Plant ID | 67945 |
| Plant Name | Juniper Creek Storage |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Sacramento |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | JCSIB |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 3 |
| Planned Operation Year | 2028 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 38.554073 |
| Longitude | -121.2066 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1463 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:970
Sources EV-4bd48aa974f682efb1df34eaEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4077582fd9a019563ba62d8038d207cbb5b947c5e6c3968b8a2079c8baaaa85f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1463
Sources EV-a746d0e4cd64743184dc501cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c76642592fbbace86fc94fd6bd8b3278e577df3a77e183614a2164f3d918f522
Usage terms US government public domain
