Whitetail Wind Farm / 1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 67.2 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-2fc0045312fac62521226562 |
| Net Summer Capacity (MW) | 67.2 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-2fc0045312fac62521226562 |
| Net Winter Capacity (MW) | 67.2 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-2fc0045312fac62521226562 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 67379 |
| Plant Name | Whitetail Wind Farm |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Grant |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 67.2 |
| Net Summer Capacity (MW) | 67.2 |
| Net Winter Capacity (MW) | 67.2 |
| Technology | Onshore Wind Turbine |
| Energy Source Code | WND |
| Prime Mover Code | WT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 42.951448 |
| Longitude | -90.4407 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1279 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:839
Sources EV-3a31561fa6ae3eadadb71209Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 732efd8de351dbf3d87ae79dab32c13096ce7e7856c45b4d1242924e19e58fd1
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1279
Sources EV-2fc0045312fac62521226562Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e3a35490a6ed933ad75d1979e733c3947cd287762f2bdc099baa804898f0d558
Usage terms US government public domain
