United States of America · Generator · plant location

Riverside Solar LLC / NYRIV

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
AES Clean Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.06585, -76.1222

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Riverside Solar LLC / NYRIV

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-70ad04253c1c5a06f2719717
Net Summer Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-70ad04253c1c5a06f2719717
Net Winter Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-70ad04253c1c5a06f2719717
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID67325
Plant NameRiverside Solar LLC
Google MapMap
Bing MapMap
Plant StateNY
CountySt Lawrence
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDNYRIV
Nameplate Capacity (MW)100
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month7
Planned Operation Year2029
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude44.06585
Longitude-76.1222
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1942

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:825

Sources EV-e1181ef6b27e6399698ec6d8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2c3376f00822754c09976f4a2fb8e1856a45d32e08da36f8250c015e05ee93b7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1942

Sources EV-70ad04253c1c5a06f2719717
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 88af10ea6f7f105fea8abb1f639be91466521633fb6e9daf9c960dfc42438695

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel