United States of America · Generator · plant location

Chevelon Butte Phase 2 / CHVB2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
AES Clean Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.6821, -110.803

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Chevelon Butte Phase 2 / CHVB2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)216 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-079a0f0481375b648692a314
Net Summer Capacity (MW)216 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-079a0f0481375b648692a314
Net Winter Capacity (MW)216 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-079a0f0481375b648692a314
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID67176
Plant NameChevelon Butte Phase 2
Google MapMap
Bing MapMap
Plant StateAZ
CountyCoconino
Balancing Authority CodeAZPS
SectorIPP Non-CHP
Generator IDCHVB2
Nameplate Capacity (MW)216
Net Summer Capacity (MW)216
Net Winter Capacity (MW)216
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month4
Operating Year2024
Status(OP) Operating
Latitude34.6821
Longitude-110.803
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:26002

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:25928

Sources EV-51b964ec72098a2308af91ec
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7f9d82004a19e629988a7537ad35fe39f86d12f76f76f250424ebeb89d8d90cf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:26002

Sources EV-079a0f0481375b648692a314
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 504e3fe7b71a18b0b1e1aecb772cf284e849e347c09e915dff1e4a2b726fd56b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel