Hillsboro Solar 3 / HILL3
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-dfba90a214a8d31660056e9d |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-dfba90a214a8d31660056e9d |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-dfba90a214a8d31660056e9d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65777 |
| Entity Name | Urban Grid Solar |
| Plant ID | 66852 |
| Plant Name | Hillsboro Solar 3 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AL |
| County | Lawrence |
| Balancing Authority Code | TVA |
| Sector | IPP Non-CHP |
| Generator ID | HILL3 |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 5 |
| Planned Operation Year | 2027 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 34.669883 |
| Longitude | -87.2332 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:811 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:741
Sources EV-ca9b00f6d3f94e578b7b0894Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a6a1140919f2e2216642953c1a7f9e4bb8156759ee2b513d736ab8afe8d05562
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:811
Sources EV-dfba90a214a8d31660056e9dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a03202da376f764985b8924b913bf51cb6a72c7a29f6db15a302e13b13b2e3fe
Usage terms US government public domain
