Elevate Middletown / ELVMT
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 275 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d56bb263baeb463babce4ba6 |
| Net Summer Capacity (MW) | 275 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d56bb263baeb463babce4ba6 |
| Net Winter Capacity (MW) | 275 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d56bb263baeb463babce4ba6 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65762 |
| Entity Name | Lighthouse Middletown, LLC |
| Plant ID | 66786 |
| Plant Name | Elevate Middletown |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CT |
| County | Middlesex |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | ELVMT |
| Nameplate Capacity (MW) | 275 |
| Net Summer Capacity (MW) | 275 |
| Net Winter Capacity (MW) | 275 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 41.554321 |
| Longitude | -72.57832 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1260 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:733
Sources EV-6b272196fed5891f0ddfc27eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 255fd8983b86e1f3570b7d23d49a10950544d8d75ace33b6aaff60753418af59
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1260
Sources EV-d56bb263baeb463babce4ba6Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6daa47780bd2f8bdaab023df353238c7f42b1b89b3cac45ba2dab3313299b3a0
Usage terms US government public domain
