Arco Wind and Solar Project / 37565
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 153 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-de53d13d13037ac146874b79 |
| Net Summer Capacity (MW) | 153 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-de53d13d13037ac146874b79 |
| Net Winter Capacity (MW) | 153 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-de53d13d13037ac146874b79 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 14354 |
| Entity Name | PacifiCorp |
| Plant ID | 66651 |
| Plant Name | Arco Wind and Solar Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | ID |
| County | Bonneville |
| Balancing Authority Code | PACE |
| Sector | Electric Utility |
| Generator ID | 37565 |
| Nameplate Capacity (MW) | 153 |
| Net Summer Capacity (MW) | 153 |
| Net Winter Capacity (MW) | 153 |
| Technology | Onshore Wind Turbine |
| Energy Source Code | WND |
| Prime Mover Code | WT |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 43.557 |
| Longitude | -112.4415 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1256 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:690
Sources EV-2fa4306b599c0c1e77255646Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a9f5539a00c33b1209b913f1cce458c39c407a42f982af10eba24ed20f1314a1
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1256
Sources EV-de53d13d13037ac146874b79Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 472288445fe8e4dd461a8e2650b741355c12cce3d296cfe3cacaeb38b71d6e71
Usage terms US government public domain
