Redbud Run Solar / 10
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 30 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-56bead12f234089262021232 |
| Net Summer Capacity (MW) | 30 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-56bead12f234089262021232 |
| Net Winter Capacity (MW) | 30 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-56bead12f234089262021232 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 58468 |
| Entity Name | Dominion Renewable Energy |
| Plant ID | 65930 |
| Plant Name | Redbud Run Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | VA |
| County | Frederick |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | 10 |
| Nameplate Capacity (MW) | 30 |
| Net Summer Capacity (MW) | 30 |
| Net Winter Capacity (MW) | 30 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 10 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 39.21157 |
| Longitude | -78.08417 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1686 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:575
Sources EV-863c58000472ef91ff943a83Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b5dfc335257b107b3bfd42c420a5ff5a30291e5713b8b7b56e64fedf8f17775b
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1686
Sources EV-56bead12f234089262021232Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ffc2a20cf7961f56be48d6981431d166723c52723b501e1c0f14e94965133535
Usage terms US government public domain
