United States of America · Generator · plant location

OCI SunRoper / OCIRO

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
OCI Energy LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
29.240399, -96.01154

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

OCI SunRoper / OCIRO

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)260 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-a4aa26370a83b05245b8d612
Net Summer Capacity (MW)260 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-a4aa26370a83b05245b8d612
Net Winter Capacity (MW)260 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-a4aa26370a83b05245b8d612
Detailed source fields
Original source fieldPublished value or condition
Entity ID58489
Entity NameOCI Energy LLC
Plant ID65893
Plant NameOCI SunRoper
Google MapMap
Bing MapMap
Plant StateTX
CountyWharton
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDOCIRO
Nameplate Capacity (MW)260
Net Summer Capacity (MW)260
Net Winter Capacity (MW)260
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude29.240399
Longitude-96.01154
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1242

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:570

Sources EV-fe8f7e61eb0642bd147173fe
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7f41ca63a50f893719f69503af21f161829c6c925a7e096ead840627b4bea7bb

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1242

Sources EV-a4aa26370a83b05245b8d612
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 15ff431584ea2ded0ccf3ed5a94c613858cf3c81626d80d34fa5c01881f199e5

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel