Coyote Springs (TX) / CYSTD
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 9.9 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-6b00309ff016a92dd88830b4 |
| Net Summer Capacity (MW) | 9.9 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-6b00309ff016a92dd88830b4 |
| Net Winter Capacity (MW) | 9.9 MW | Original source column definition · Generator · (T) Regulatory approvals received. Not under construction As-of date 2026-08 Sources EV-6b00309ff016a92dd88830b4 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 65076 |
| Entity Name | HEN Infrastructure, L.L.C. |
| Plant ID | 65811 |
| Plant Name | Coyote Springs (TX) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Reeves |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | CYSTD |
| Nameplate Capacity (MW) | 9.9 |
| Net Summer Capacity (MW) | 9.9 |
| Net Winter Capacity (MW) | 9.9 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | IC |
| Planned Operation Month | 2 |
| Planned Operation Year | 2027 |
| Status | (T) Regulatory approvals received. Not under construction |
| Latitude | 31.39471 |
| Longitude | -103.6303 |
| Original text | (T) Regulatory approvals received. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:651 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:545
Sources EV-078cd708437c6ba6d8811b54Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 33f0d673d0f422d14319e21e84e2a117c0af6a805ae5224ea78401c45fadba2e
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:651
Sources EV-6b00309ff016a92dd88830b4Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 64683313f26282f3ef8769b2263b4d91915ab8344a6696d788d22349c9393d00
Usage terms US government public domain
