Chukar Battery Energy Storage System / CHUK1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-82ec527e91f56282736cfa53 |
| Net Summer Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-82ec527e91f56282736cfa53 |
| Net Winter Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-82ec527e91f56282736cfa53 |
| Nameplate Energy Capacity (MWh) | 40 MWh | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-82ec527e91f56282736cfa53 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13407 |
| Entity Name | Nevada Power Co |
| Plant ID | 65472 |
| Plant Name | Chukar Battery Energy Storage System |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NV |
| County | Storey |
| Balancing Authority Code | NEVP |
| Sector | Electric Utility |
| Generator ID | CHUK1 |
| Nameplate Capacity (MW) | 10 |
| Net Summer Capacity (MW) | 10 |
| Net Winter Capacity (MW) | 10 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Operating Month | 7 |
| Operating Year | 2021 |
| Status | (OP) Operating |
| Nameplate Energy Capacity (MWh) | 40 |
| Latitude | 39.55636 |
| Longitude | -119.4367 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:24060 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:24040
Sources EV-f7ee39b0d752d8b6d1cd4cdeEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c62431bdfcc48571577afa84bd90e2b83a2cfa7ec54227439f55ad2ae9d0d136
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:24060
Sources EV-82ec527e91f56282736cfa53Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 da81945a61f555bcc7ecda0a392c653ec893d0c2bf930cc6c08361980b29a086
Usage terms US government public domain
