United States of America · Generator · plant location

Kingwood Solar / KWOOD

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Vesper Energy Development LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
39.782, -83.83

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Kingwood Solar / KWOOD

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)175 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-264abb0f1cb2d53ed9a4d14c
Net Summer Capacity (MW)175 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-264abb0f1cb2d53ed9a4d14c
Net Winter Capacity (MW)175 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-264abb0f1cb2d53ed9a4d14c
Detailed source fields
Original source fieldPublished value or condition
Entity ID64545
Entity NameVesper Energy Development LLC
Plant ID65425
Plant NameKingwood Solar
Google MapMap
Bing MapMap
Plant StateOH
CountyGreene
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDKWOOD
Nameplate Capacity (MW)175
Net Summer Capacity (MW)175
Net Winter Capacity (MW)175
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2027
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude39.782
Longitude-83.83
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1237

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:527

Sources EV-65a159bbdb39b237adb6930f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 51e284dd9a548dd0b2a4f4cb06a442a307cfa13d347ccda775d6d94b147aec54

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1237

Sources EV-264abb0f1cb2d53ed9a4d14c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 16d05db4a01f9d595da25c5480d4b0fb4ce26b32df25c9f8226cc2508cb12018

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel