Hot Pot Solar / HPB
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 280 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-df901591f198acd7be76fc04 |
| Net Summer Capacity (MW) | 280 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-df901591f198acd7be76fc04 |
| Net Winter Capacity (MW) | 280 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-df901591f198acd7be76fc04 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13407 |
| Entity Name | Nevada Power Co |
| Plant ID | 65419 |
| Plant Name | Hot Pot Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NV |
| County | Humboldt |
| Balancing Authority Code | NEVP |
| Sector | Electric Utility |
| Generator ID | HPB |
| Nameplate Capacity (MW) | 280 |
| Net Summer Capacity (MW) | 280 |
| Net Winter Capacity (MW) | 280 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Latitude | 40.887886 |
| Longitude | -117.1305 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:1518 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:5627
Sources EV-36e4596462cdfbf70728e68cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c36515f9ce1b322c025a4262405283b27371cde4a08a2d369ec5873412ad6957
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:1518
Sources EV-df901591f198acd7be76fc04Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 2371c207c96aa86e165a7e770ab6b892016f7985ef40f46020808a495202b94d
Usage terms US government public domain
