Mark One Power Station / CTG-1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 60.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1dee83f7f7d11b4e0b4550cb |
| Net Summer Capacity (MW) | 44.6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1dee83f7f7d11b4e0b4550cb |
| Net Winter Capacity (MW) | 49.8 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1dee83f7f7d11b4e0b4550cb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 16604 |
| Entity Name | City of San Antonio - (TX) |
| Plant ID | 65372 |
| Plant Name | Mark One Power Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Brazoria |
| Balancing Authority Code | ERCO |
| Sector | Electric Utility |
| Generator ID | CTG-1 |
| Nameplate Capacity (MW) | 60.5 |
| Net Summer Capacity (MW) | 44.6 |
| Net Winter Capacity (MW) | 49.8 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 11 |
| Operating Year | 2022 |
| Status | (OP) Operating |
| Latitude | 29.227109 |
| Longitude | -95.43076 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:23944 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:23927
Sources EV-e4d28773937533bfa3382645Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4f15310cdf36b50c84fb9426d009dd775064405304f151eb3fa3e75de306209a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:23944
Sources EV-1dee83f7f7d11b4e0b4550cbEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ceda6013f1bf2496b976996163918966dcd9f9f76b794594d65a50ba7e4c8afd
Usage terms US government public domain
