Steward Creek Solar Phase 1 / SC1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1200 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-166c18c28df490608c8be3d3 |
| Net Summer Capacity (MW) | 1200 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-166c18c28df490608c8be3d3 |
| Net Winter Capacity (MW) | 1200 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-166c18c28df490608c8be3d3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67725 |
| Entity Name | TerraForm Power Operating, LLC |
| Plant ID | 65301 |
| Plant Name | Steward Creek Solar Phase 1 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | IL |
| County | Lee |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | SC1 |
| Nameplate Capacity (MW) | 1200 |
| Net Summer Capacity (MW) | 1200 |
| Net Winter Capacity (MW) | 1200 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2029 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 41.814343 |
| Longitude | -88.98988 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:2009 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:507
Sources EV-267847148defae7734698d4bEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5e79800114f788ed1590863a8ea4307f34567490e260e6ccaa486682eddc3718
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:2009
Sources EV-166c18c28df490608c8be3d3Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6d3d920c1f1c4e199a01d82035d40ccd845d9ae429361a4bf5d6f1c51cbb2a84
Usage terms US government public domain
