United States of America · Generator · plant location

Waterbury 22 / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Green Mountain Power Corp
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.38126, -72.76769

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Waterbury 22 / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)5.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ee29ca126994fc273afbbe49
Net Summer Capacity (MW)5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ee29ca126994fc273afbbe49
Net Winter Capacity (MW)5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ee29ca126994fc273afbbe49
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID6520
Plant NameWaterbury 22
Google MapMap
Bing MapMap
Plant StateVT
CountyWashington
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)5.5
Net Summer Capacity (MW)5
Net Winter Capacity (MW)5
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month6
Operating Year1953
Status(OP) Operating
Latitude44.38126
Longitude-72.76769
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6674

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6679

Sources EV-1fe200d0ebcf2edca01e782d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 44b3473105089ba04d8d424785d173c40cb7eb088ec1d8e2310e3f985706c30d

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6674

Sources EV-ee29ca126994fc273afbbe49
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 f0aa7f2e0f9299c12f18c12667d45778ed13c9e86b29e3eb6e4b48d485e8c2b8

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel