United States of America · Generator · plant location

Big Turtle Wind Farm 2 / BTWF2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
DTE Electric Company
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.919558, -82.79443

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Big Turtle Wind Farm 2 / BTWF2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)29.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2261777e2a987c1a8d118e72
Net Summer Capacity (MW)29.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2261777e2a987c1a8d118e72
Net Winter Capacity (MW)29.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-2261777e2a987c1a8d118e72
Detailed source fields
Original source fieldPublished value or condition
Entity ID5109
Entity NameDTE Electric Company
Plant ID65143
Plant NameBig Turtle Wind Farm 2
Google MapMap
Bing MapMap
Plant StateMI
CountyHuron
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDBTWF2
Nameplate Capacity (MW)29.4
Net Summer Capacity (MW)29.4
Net Winter Capacity (MW)29.4
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month10
Operating Year2016
Status(OP) Operating
Latitude43.919558
Longitude-82.79443
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:23725

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:23708

Sources EV-d2eb6ae6f5daa75ae8e3e9a4
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1f1f32aa964d8afcbc759308ed13aa00ea4bc38dc69fb499fd0b4848beb9fd6a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:23725

Sources EV-2261777e2a987c1a8d118e72
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 51e26f82bae19e4b0b814146071bc05a8fa51b9f1020b5d9b132e2cf75c6a3ef

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel