160 Tihonet Rd Hybrid(CSG) / 160BA
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3.3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-48ecd13d302850a2b08916c2 |
| Net Summer Capacity (MW) | 3.3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-48ecd13d302850a2b08916c2 |
| Net Winter Capacity (MW) | 3.3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-48ecd13d302850a2b08916c2 |
| Nameplate Energy Capacity (MWh) | 6.9 MWh | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-48ecd13d302850a2b08916c2 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 64472 |
| Entity Name | 160TIH WHAM8 Solar, LLC |
| Plant ID | 65056 |
| Plant Name | 160 Tihonet Rd Hybrid(CSG) |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MA |
| County | Plymouth |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | 160BA |
| Nameplate Capacity (MW) | 3.3 |
| Net Summer Capacity (MW) | 3.3 |
| Net Winter Capacity (MW) | 3.3 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Operating Month | 12 |
| Operating Year | 2021 |
| Status | (OP) Operating |
| Nameplate Energy Capacity (MWh) | 6.9 |
| Latitude | 41.793414 |
| Longitude | -70.71267 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:23657 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:23641
Sources EV-604e6f523a294ee81513ee67Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bb6c860c2eabb89d8daa4f590c5c216d50d9868b32a847bd9f8c1f864b087d0a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:23657
Sources EV-48ecd13d302850a2b08916c2Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c167bf81e8faccc3d47f35546b108bbcdeda083560e9b95310758c7ad6bd2451
Usage terms US government public domain
