United States of America · Generator · plant location

AEUG Madison Solar, LLC / AMS

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Acciona Energy USA Global, LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.822029, -84.30052

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

AEUG Madison Solar, LLC / AMS

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)100 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-d4ed44e67180a0fa78a1c50e
Net Summer Capacity (MW)100 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-d4ed44e67180a0fa78a1c50e
Net Winter Capacity (MW)100 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-d4ed44e67180a0fa78a1c50e
Detailed source fields
Original source fieldPublished value or condition
Entity ID57416
Entity NameAcciona Energy USA Global, LLC
Plant ID64659
Plant NameAEUG Madison Solar, LLC
Google MapMap
Bing MapMap
Plant StateKY
CountyMadison
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDAMS
Nameplate Capacity (MW)100
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month9
Planned Operation Year2028
Status(U) Under construction, less than or equal to 50 percent complete
Latitude37.822029
Longitude-84.30052
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1661

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:459

Sources EV-a7110d52230947c8192432ea
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2aa049446d82f0c77af46a2653f8e23a5236a748445f0f9b1bbc54b92c12f705

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1661

Sources EV-d4ed44e67180a0fa78a1c50e
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ba13fe18fd22266abdd8bd44fd9912456ed10cc744d0452cd9a4792d29953587

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel