| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 99 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b38ef2351d7f3d93ccd96c35 |
| Net Summer Capacity (MW) | 99 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b38ef2351d7f3d93ccd96c35 |
| Net Winter Capacity (MW) | 99 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-b38ef2351d7f3d93ccd96c35 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 56201 |
| Entity Name | Engie North America |
| Plant ID | 64531 |
| Plant Name | Noosa Energy Storage LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | San Joaquin |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | KOV4A |
| Nameplate Capacity (MW) | 99 |
| Net Summer Capacity (MW) | 99 |
| Net Winter Capacity (MW) | 99 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 37.756292 |
| Longitude | -121.1481 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:24 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:446
Sources EV-2f74f77e21e351d4916dc3beEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1cb1daab8c25c7643eed6b8e03287aede4b5829f629061e1f837d20157cb6465
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:24
Sources EV-b38ef2351d7f3d93ccd96c35Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 88d3dfb826e8a9467e07ddb13602c8d35749f0b1c3d5fb2ee9eccdb0f78464bb
Usage terms US government public domain