United States of America · Generator · plant location

Beldens / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Green Mountain Power Corp
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
44.0525, -73.1762

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Beldens / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d42bfa6eeb790aa3d5bb677
Net Summer Capacity (MW)0.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d42bfa6eeb790aa3d5bb677
Net Winter Capacity (MW)0.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0d42bfa6eeb790aa3d5bb677
Detailed source fields
Original source fieldPublished value or condition
Entity ID7601
Entity NameGreen Mountain Power Corp
Plant ID6451
Plant NameBeldens
Google MapMap
Bing MapMap
Plant StateVT
CountyAddison
Balancing Authority CodeISNE
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)0.8
Net Summer Capacity (MW)0.6
Net Winter Capacity (MW)0.8
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month8
Operating Year1913
Status(OP) Operating
Latitude44.0525
Longitude-73.1762
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6577

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6582

Sources EV-abd4596eddb17fd5a0228e0b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8201efd1d2e64459433f1bbb6148efcc9c026b1fc584bbdc31611eee2969898a

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6577

Sources EV-0d42bfa6eeb790aa3d5bb677
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 919466bad0aa6d2ede4257d48a708d69773637966f3556b9ea79199533c8ae7d

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel