United States of America · Generator · plant location

Armadillo Solar Center / 6666

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
AES Clean Energy
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
32.00014, -96.2027

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Armadillo Solar Center / 6666

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)175 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-37ffd71e7bb766dd7390ce74
Net Summer Capacity (MW)175 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-37ffd71e7bb766dd7390ce74
Net Winter Capacity (MW)175 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-37ffd71e7bb766dd7390ce74
Detailed source fields
Original source fieldPublished value or condition
Entity ID64904
Entity NameAES Clean Energy
Plant ID64349
Plant NameArmadillo Solar Center
Google MapMap
Bing MapMap
Plant StateTX
CountyNavarro
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator ID6666
Nameplate Capacity (MW)175
Net Summer Capacity (MW)175
Net Winter Capacity (MW)175
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month4
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude32.00014
Longitude-96.2027
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:750

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:443

Sources EV-a35c00e70be0b3aecd64560b
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 11f27e76a7136685029962dbd7158f0c1028a3b7c3aefbfcdc7b03f468a05b2c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:750

Sources EV-37ffd71e7bb766dd7390ce74
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8720ddcb857391955f60f8e8840778bcb47ee38c76789f8b18d7c23a6bf50449

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel