Aratina Solar Center 2 / 45MGA
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 150 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-21f34a67cfcd5ae9a8b737ed |
| Net Summer Capacity (MW) | 150 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-21f34a67cfcd5ae9a8b737ed |
| Net Winter Capacity (MW) | 150 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-21f34a67cfcd5ae9a8b737ed |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 63825 |
| Entity Name | 45MG 8me LLC |
| Plant ID | 64215 |
| Plant Name | Aratina Solar Center 2 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Kern |
| Balancing Authority Code | CISO |
| Sector | IPP Non-CHP |
| Generator ID | 45MGA |
| Nameplate Capacity (MW) | 150 |
| Net Summer Capacity (MW) | 150 |
| Net Winter Capacity (MW) | 150 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 35.062965 |
| Longitude | -118.0878 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:451 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:429
Sources EV-0dc1f3ed2bdcd40bdcd7872bEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dff17c2c3039dc6773461add9992ce43879f20ac91267fd092c7dce845b71837
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:451
Sources EV-21f34a67cfcd5ae9a8b737edEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 22f1e9c1b2e09d3b870d783282a1a1baafab3fead9625e81506beb0214245c13
Usage terms US government public domain
