United States of America · Generator · plant location

Elephant Butte / 3

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
U S Bureau of Reclamation
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.153358, -107.192

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Elephant Butte / 3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)9.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1ffe47bcd5b4abae1becd170
Net Summer Capacity (MW)9.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1ffe47bcd5b4abae1becd170
Net Winter Capacity (MW)9.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1ffe47bcd5b4abae1becd170
Detailed source fields
Original source fieldPublished value or condition
Entity ID2518
Entity NameU S Bureau of Reclamation
Plant ID6402
Plant NameElephant Butte
Google MapMap
Bing MapMap
Plant StateNM
CountySierra
Balancing Authority CodeWACM
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)9.3
Net Summer Capacity (MW)9.3
Net Winter Capacity (MW)9.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month11
Operating Year1940
Status(OP) Operating
Latitude33.153358
Longitude-107.192
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6492

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6497

Sources EV-675004c6360751e34e79c7f1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a070f9ba8fa20ebdb0e00f516e2796d5d6ebfb82f02f7ea6890ced57f38f387f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6492

Sources EV-1ffe47bcd5b4abae1becd170
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 df28e300486225bba46da7ecd2fdbfe712d90480150a54d9afcefbc341c7b299

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel