Atchison County Wind / GEN1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 299 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-e6b9796947ca052770dc0751 |
| Net Summer Capacity (MW) | 275.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-e6b9796947ca052770dc0751 |
| Net Winter Capacity (MW) | 288.9 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-e6b9796947ca052770dc0751 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 19436 |
| Entity Name | Union Electric Co - (MO) |
| Plant ID | 63574 |
| Plant Name | Atchison County Wind |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MO |
| County | Atchison |
| Balancing Authority Code | SWPP |
| Sector | Electric Utility |
| Generator ID | GEN1 |
| Nameplate Capacity (MW) | 299 |
| Net Summer Capacity (MW) | 275.5 |
| Net Winter Capacity (MW) | 288.9 |
| Technology | Onshore Wind Turbine |
| Energy Source Code | WND |
| Prime Mover Code | WT |
| Operating Month | 3 |
| Operating Year | 2021 |
| Status | (OP) Operating |
| Latitude | 40.531283 |
| Longitude | -95.35488 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:21942 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:21934
Sources EV-1a69d5242eacad270510842cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 12ea13453a8f3eafea80a8cc60fb0cc17c195b7fe89b8e154732f4b267030e5d
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:21942
Sources EV-e6b9796947ca052770dc0751Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 19be5ccec9ea4ef152aebb27743e760d286e6eecf141db4f3a1f87554bc065a1
Usage terms US government public domain
