United States of America · Generator · plant location

Solar BESS Hybrid / GEN04

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Cobb Electric Membership Corporation
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
33.979348, -84.55613

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Solar BESS Hybrid / GEN04

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-70cdfbdca4709e065841469d
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-70cdfbdca4709e065841469d
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-70cdfbdca4709e065841469d
Detailed source fields
Original source fieldPublished value or condition
Entity ID63260
Entity NameCobb Electric Membership Corporation
Plant ID63535
Plant NameSolar BESS Hybrid
Google MapMap
Bing MapMap
Plant StateGA
CountyCobb
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDGEN04
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month5
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude33.979348
Longitude-84.55613
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:804

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:376

Sources EV-819c6e06ef562c96f4123ca1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d655fabf126be6e2dce5ca4326390822d13f8e77b8ee128acdcba9bd738c982

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:804

Sources EV-70cdfbdca4709e065841469d
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5ff6e475a5db5d0228b6c9ae945288ec63438f2de146db7623d2443b95efed7e

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel