Hickory Park Solar Hybrid / HPBAT
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 40 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-41fa3b69f5bc4babe09d88f3 |
| Net Summer Capacity (MW) | 40 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-41fa3b69f5bc4babe09d88f3 |
| Net Winter Capacity (MW) | 40 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-41fa3b69f5bc4babe09d88f3 |
| Nameplate Energy Capacity (MWh) | 80 MWh | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-41fa3b69f5bc4babe09d88f3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67192 |
| Entity Name | RWE Clean Energy |
| Plant ID | 63522 |
| Plant Name | Hickory Park Solar Hybrid |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Mitchell |
| Balancing Authority Code | SOCO |
| Sector | IPP Non-CHP |
| Generator ID | HPBAT |
| Nameplate Capacity (MW) | 40 |
| Net Summer Capacity (MW) | 40 |
| Net Winter Capacity (MW) | 40 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Operating Month | 6 |
| Operating Year | 2022 |
| Status | (OP) Operating |
| Nameplate Energy Capacity (MWh) | 80 |
| Latitude | 31.269676 |
| Longitude | -84.17632 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:21868 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:21860
Sources EV-8a0106f31f10bd5909b344f9Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 15d928f9282081053be8e07c8e80602366e9ddad20bb8492271cef0259fbdfc0
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:21868
Sources EV-41fa3b69f5bc4babe09d88f3Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 51f0b8f985399156900aa710d1ae2006b29bb20086d533ac805020e16d7949be
Usage terms US government public domain
