P L Bartow / P2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 55.4 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6f03b541e25b0d8aab49aec1 |
| Net Summer Capacity (MW) | 41 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6f03b541e25b0d8aab49aec1 |
| Net Winter Capacity (MW) | 53 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-6f03b541e25b0d8aab49aec1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 6455 |
| Entity Name | Duke Energy Florida, LLC |
| Plant ID | 634 |
| Plant Name | P L Bartow |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Pinellas |
| Balancing Authority Code | FPC |
| Sector | Electric Utility |
| Generator ID | P2 |
| Nameplate Capacity (MW) | 55.4 |
| Net Summer Capacity (MW) | 41 |
| Net Winter Capacity (MW) | 53 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 6 |
| Operating Year | 1972 |
| Planned Retirement Month | 6 |
| Planned Retirement Year | 2034 |
| Status | (OP) Operating |
| Latitude | 27.859535 |
| Longitude | -82.60176 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:1063 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:1057
Sources EV-c838f1212f83ea8b8a5048d0Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a51e6114203486de9e5d87699c249a6d1893f715cc1ad0001adb36da76fa5451
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:1063
Sources EV-6f03b541e25b0d8aab49aec1Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7ea9b41db5fab26d01b1f4d1f4ef3f4a4c1fa43a3686d23c9a41440a647bbe3d
Usage terms US government public domain
