United States of America · Generator · plant location

LafargeHolcim - Paulding Wind Project / L3

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Paulding Wind 28, LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
41.192377, -84.61256

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

LafargeHolcim - Paulding Wind Project / L3

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-00196d691fba9b0b9821dde2
Net Summer Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-00196d691fba9b0b9821dde2
Net Winter Capacity (MW)1.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-00196d691fba9b0b9821dde2
Detailed source fields
Original source fieldPublished value or condition
Entity ID62644
Entity NamePaulding Wind 28, LLC
Plant ID62752
Plant NameLafargeHolcim - Paulding Wind Project
Google MapMap
Bing MapMap
Plant StateOH
CountyPaulding
Balancing Authority CodePJM
SectorIndustrial Non-CHP
Generator IDL3
Nameplate Capacity (MW)1.5
Net Summer Capacity (MW)1.5
Net Winter Capacity (MW)1.5
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month8
Operating Year2020
Status(OP) Operating
Latitude41.192377
Longitude-84.61256
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:21094

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:21088

Sources EV-ba3b3dd8feb845201e06b627
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 776026976b26776669ba857e9be2f292bdaa19aef6ce385e6dac6b0b975687e6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:21094

Sources EV-00196d691fba9b0b9821dde2
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d2cf8e6f2eb97a28930bbf65aee93dd3cbd3b6651cb9e1a8a2e75bea9a1231db

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel