Solemio LLC / 1
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 80 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-1b9e6b2d872881a61b61e07b |
| Net Summer Capacity (MW) | 79.8 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-1b9e6b2d872881a61b61e07b |
| Net Winter Capacity (MW) | 79.8 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-1b9e6b2d872881a61b61e07b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 56545 |
| Entity Name | Pattern Operators LP |
| Plant ID | 62522 |
| Plant Name | Solemio LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Hopkins |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 80 |
| Net Summer Capacity (MW) | 79.8 |
| Net Winter Capacity (MW) | 79.8 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Latitude | 33.100314 |
| Longitude | -95.62205 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:1324 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:5485
Sources EV-f88c6ca820c9e644c484a9efEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8b6c3d4cfda3e29c2acb033b106fdc56ac91fd1e03dbbe5ce0f523d08c300d42
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:1324
Sources EV-1b9e6b2d872881a61b61e07bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a1dda83a7a20d7d2af0ef6096d74ec1b492c4119fb40267d0ade1b91ace3a9c6
Usage terms US government public domain
