Overton Hydroelectric Project / NA6
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 8.1 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-72d4530b8ab458d4add67b05 |
| Net Summer Capacity (MW) | 5.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-72d4530b8ab458d4add67b05 |
| Net Winter Capacity (MW) | 7.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-72d4530b8ab458d4add67b05 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62391 |
| Plant Name | Overton Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Rapides |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | NA6 |
| Nameplate Capacity (MW) | 8.1 |
| Net Summer Capacity (MW) | 5.5 |
| Net Winter Capacity (MW) | 7.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.185978 |
| Longitude | -92.29309 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1629 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:313
Sources EV-7f32d5ccb984734c559f13bdEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 68cf289300c494bb3eb2b2b648eb72b9f974193053380faed2264dcb1044bc6f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1629
Sources EV-72d4530b8ab458d4add67b05Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1e432f8afb709588dcf784948a71e8446e2426e454dbc396ede97194cdd3fdbf
Usage terms US government public domain
