Overton Hydroelectric Project / NA4
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 8.1 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-0e8aa46ad8d8c4597903e985 |
| Net Summer Capacity (MW) | 5.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-0e8aa46ad8d8c4597903e985 |
| Net Winter Capacity (MW) | 7.5 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-0e8aa46ad8d8c4597903e985 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 61906 |
| Entity Name | Rye Development |
| Plant ID | 62391 |
| Plant Name | Overton Hydroelectric Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | Rapides |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | NA4 |
| Nameplate Capacity (MW) | 8.1 |
| Net Summer Capacity (MW) | 5.5 |
| Net Winter Capacity (MW) | 7.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Planned Operation Month | 7 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 31.185978 |
| Longitude | -92.29309 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1585 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:311
Sources EV-37c7b03eac8bca396025f204Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f7f9c0d1ffc83d436c74ea101573faf7095c29f4147485d43d013b146c762afe
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1585
Sources EV-0e8aa46ad8d8c4597903e985Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 d58c8ea134b5538877eb4c7a591432a352b232f7ffbe454a6945a3982e1289da
Usage terms US government public domain