Dignity - San Martin / PV1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-92df21edb5f811180be15b14 |
| Net Summer Capacity (MW) | 1.7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-92df21edb5f811180be15b14 |
| Net Winter Capacity (MW) | 1.7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-92df21edb5f811180be15b14 |
| DC Net Capacity (MW) | 2.1 MWdc | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-92df21edb5f811180be15b14 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 61944 |
| Entity Name | MN8 Energy LLC |
| Plant ID | 61862 |
| Plant Name | Dignity - San Martin |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NV |
| County | Clark |
| Balancing Authority Code | NEVP |
| Sector | IPP Non-CHP |
| Generator ID | PV1 |
| Nameplate Capacity (MW) | 1.7 |
| Net Summer Capacity (MW) | 1.7 |
| Net Winter Capacity (MW) | 1.7 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Operating Month | 5 |
| Operating Year | 2018 |
| Status | (OP) Operating |
| DC Net Capacity (MW) | 2.1 |
| Latitude | 36.057181 |
| Longitude | -115.2721 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:20120 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:20116
Sources EV-88aab582c9dfefabaf88b5d6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 699f5dc0ee99f290750542f64f2515f932c6791616d5c16d0b8b4005f407d370
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:20120
Sources EV-92df21edb5f811180be15b14Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e03954af8e4dfc10246a9758362f4924bfcd6237c38e9c902ab5fd815f61ba50
Usage terms US government public domain
