United States of America · Generator · plant location

J T Deely / 2

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
City of San Antonio - (TX)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
29.308056, -98.3228

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

J T Deely / 2

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)446 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-b41f525cd320bff6d9190d56
Net Summer Capacity (MW)420 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-b41f525cd320bff6d9190d56
Net Winter Capacity (MW)420 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-b41f525cd320bff6d9190d56
Detailed source fields
Original source fieldPublished value or condition
Entity ID16604
Entity NameCity of San Antonio - (TX)
Plant ID6181
Plant NameJ T Deely
Google MapMap
Bing MapMap
Plant StateTX
CountyBexar
Balancing Authority CodeERCO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)446
Net Summer Capacity (MW)420
Net Winter Capacity (MW)420
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month8
Operating Year1978
Retirement Month1
Retirement Year2023
Latitude29.308056
Longitude-98.3228
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:1052

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2499

Sources EV-d12abc3ef54ae08e9ad03873
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8d734c6686a86a5d1f1a996abd9d4539fce92631e096b9dcdfaf2b023f0600cc

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:1052

Sources EV-b41f525cd320bff6d9190d56
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5c9132367c86a27582eb241fc249ecde1eba4d124b7496a10de1af578df8862c

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel