Blazing Star 2 Wind Farm / BLZS2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 200 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-22deb0b6cbc8c8ec0e86736e |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-22deb0b6cbc8c8ec0e86736e |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-22deb0b6cbc8c8ec0e86736e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 61650 |
| Plant Name | Blazing Star 2 Wind Farm |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Lincoln |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | BLZS2 |
| Nameplate Capacity (MW) | 200 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Onshore Wind Turbine |
| Energy Source Code | WND |
| Prime Mover Code | WT |
| Operating Month | 1 |
| Operating Year | 2021 |
| Status | (OP) Operating |
| Latitude | 44.445293 |
| Longitude | -96.35276 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:19866 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:19862
Sources EV-ca4baee67910cd30980f5f72Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 749ec67d42bd24f1bc310324af72c24cfd165b9d85fa97766e29c03bed14879e
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:19866
Sources EV-22deb0b6cbc8c8ec0e86736eEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1a246f1c3cfa73038f253359c8324ab1de18aeccb2a4ce55b7c5a154f15a3e8e
Usage terms US government public domain
