Bear Creek Solar Center / BCRSC
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3c09f9630e9d241172270f7c |
| Net Summer Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3c09f9630e9d241172270f7c |
| Net Winter Capacity (MW) | 10 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3c09f9630e9d241172270f7c |
| DC Net Capacity (MW) | 13.1 MWdc | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-3c09f9630e9d241172270f7c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 60888 |
| Entity Name | GCL New Energy, Inc. |
| Plant ID | 61281 |
| Plant Name | Bear Creek Solar Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OR |
| County | Deschutes |
| Balancing Authority Code | PACW |
| Sector | IPP Non-CHP |
| Generator ID | BCRSC |
| Nameplate Capacity (MW) | 10 |
| Net Summer Capacity (MW) | 10 |
| Net Winter Capacity (MW) | 10 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Operating Month | 9 |
| Operating Year | 2018 |
| Status | (OP) Operating |
| DC Net Capacity (MW) | 13.1 |
| Latitude | 44.060814 |
| Longitude | -121.2372 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:19345 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:19342
Sources EV-1f0caa67faff49d87d2e37fbEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 2cdc9d7d8542e53f55cc23871a90c957d641838ca2bf5526664cbec1fb9d7cfd
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:19345
Sources EV-3c09f9630e9d241172270f7cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b8b954dd23222445c13615c01c116763f92a0a309708e7742263d30a3791dfb2
Usage terms US government public domain
