United States of America · Generator · plant location

Big Stone / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Otter Tail Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
45.303652, -96.51007

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Big Stone / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)450 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-76908024d621b799603854be
Net Summer Capacity (MW)477.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-76908024d621b799603854be
Net Winter Capacity (MW)491.2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-76908024d621b799603854be
Detailed source fields
Original source fieldPublished value or condition
Entity ID14232
Entity NameOtter Tail Power Co
Plant ID6098
Plant NameBig Stone
Google MapMap
Bing MapMap
Plant StateSD
CountyGrant
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)450
Net Summer Capacity (MW)477.6
Net Winter Capacity (MW)491.2
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Operating Month5
Operating Year1975
Status(OP) Operating
Latitude45.303652
Longitude-96.51007
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6042

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6036

Sources EV-b39a1d36e3dfe88a7f64e993
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5744169bf43a6cc66c857afab63daac4d9ef57eca0672e774b09ea4b577b73bf

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6042

Sources EV-76908024d621b799603854be
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 22a6047392e0611de660a0a1d18bc8e16c6ac2828c322e09192e9f8097af3a9a

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel