Dakota Solar / PV3
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-6047d6be1b04d8c8b15ece77 |
| Net Summer Capacity (MW) | 1 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-6047d6be1b04d8c8b15ece77 |
| Net Winter Capacity (MW) | 1 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-6047d6be1b04d8c8b15ece77 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 60520 |
| Entity Name | SoCore Energy LLC |
| Plant ID | 60977 |
| Plant Name | Dakota Solar |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Dakota |
| Sector | IPP Non-CHP |
| Generator ID | PV3 |
| Nameplate Capacity (MW) | 1 |
| Net Summer Capacity (MW) | 1 |
| Net Winter Capacity (MW) | 1 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Latitude | 44.8235 |
| Longitude | -93.0352 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:1149 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:5387
Sources EV-8414c16ffbfb8e3ee6be68a6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f1c3436d34b4e6a7bf7802040ca3aead0a6f3ec14c012eabb69c0329b0574c27
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:1149
Sources EV-6047d6be1b04d8c8b15ece77Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 220847c9fd833a0cbd2977c06c8661f687deb32674e9dd41caeb2d48daf43295
Usage terms US government public domain
