United States of America · Generator · plant location

Spirit Mound / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Basin Electric Power Coop
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.897663, -96.99049

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Spirit Mound / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)67.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5723d8783d12e3ecc73dbbda
Net Summer Capacity (MW)50 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5723d8783d12e3ecc73dbbda
Net Winter Capacity (MW)60 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-5723d8783d12e3ecc73dbbda
Detailed source fields
Original source fieldPublished value or condition
Entity ID1307
Entity NameBasin Electric Power Coop
Plant ID6092
Plant NameSpirit Mound
Google MapMap
Bing MapMap
Plant StateSD
CountyClay
Balancing Authority CodeSWPP
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)67.5
Net Summer Capacity (MW)50
Net Winter Capacity (MW)60
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month6
Operating Year1978
Status(OP) Operating
Latitude42.897663
Longitude-96.99049
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:6036

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:6030

Sources EV-033c0e47c50fb19e3ab36a57
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 933170c76b6984cf8158bff59893ef30499d152aa48fc7505a7f06f861717e21

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:6036

Sources EV-5723d8783d12e3ecc73dbbda
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 abcc5c6a90d87596fa735a8fe2bca051a92f9749e963fa08916be969a3a4b515

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel