United States of America · Generator · plant location

Edwin I Hatch / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Georgia Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
31.9342, -82.3447

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Edwin I Hatch / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)924 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d88b237ce1c1485736035275
Net Summer Capacity (MW)883 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d88b237ce1c1485736035275
Net Winter Capacity (MW)883 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d88b237ce1c1485736035275
Detailed source fields
Original source fieldPublished value or condition
Entity ID7140
Entity NameGeorgia Power Co
Plant ID6051
Plant NameEdwin I Hatch
Google MapMap
Bing MapMap
Plant StateGA
CountyAppling
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)924
Net Summer Capacity (MW)883
Net Winter Capacity (MW)883
TechnologyNuclear
Energy Source CodeNUC
Prime Mover CodeST
Operating Month9
Operating Year1979
Status(OP) Operating
Latitude31.9342
Longitude-82.3447
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5949

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5943

Sources EV-0d084c47994f4ab0f764cd81
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3bdcd4ee113c976e329d3a94c97f1d8984f6d6d7fcbfd0b4440ca5b606b4aaaa

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5949

Sources EV-d88b237ce1c1485736035275
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 9191e7cb9afac1d8ce2c722c5a14332fd3a765b5d834148f14626ee691a920b8

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel