United States of America · Generator · plant location

North Fork Community Power / NFCP1

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Phoenix Energy
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

North Fork Community Power / NFCP1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.7 MWOriginal source column definition · Generator · V
As-of date 2025
Sources EV-ad2909095b631b9151e204b1
Summer Capacity (MW)1.3 MWOriginal source column definition · Generator · V
As-of date 2025
Sources EV-ad2909095b631b9151e204b1
Winter Capacity (MW)1.3 MWOriginal source column definition · Generator · V
As-of date 2025
Sources EV-ad2909095b631b9151e204b1
Detailed source fields
Original source fieldPublished value or condition
Utility ID59967
Utility NamePhoenix Energy
Plant Code60192
Plant NameNorth Fork Community Power
StateCA
CountyMadera
Generator IDNFCP1
TechnologyOther Waste Biomass
Prime MoverIC
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)1.7
Nameplate Power Factor0.8
Summer Capacity (MW)1.3
Winter Capacity (MW)1.3
StatusV
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1OBG
Carbon Capture Technology?N
Multiple Fuels?N
Switch Between Oil and Natural Gas?N
Cofire Fuels?N
Original textV
source_record_id3_1_Generator_Y2025.xlsx#Proposed:238

Parent facility or plant record

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:238

Sources EV-ad2909095b631b9151e204b1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ad458e9f3ff1fe0fb34498de013034a0901194e03023930727d91d6a49717fbd

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel