Middletown Energy Center / MEC2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 233.7 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c7e5a24a27a5df92642755ca |
| Net Summer Capacity (MW) | 209.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c7e5a24a27a5df92642755ca |
| Net Winter Capacity (MW) | 222.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-c7e5a24a27a5df92642755ca |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 59124 |
| Entity Name | Ohio Power Partners, LLC |
| Plant ID | 59326 |
| Plant Name | Middletown Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OH |
| County | Butler |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | MEC2 |
| Unit Code | MCC1 |
| Nameplate Capacity (MW) | 233.7 |
| Net Summer Capacity (MW) | 209.2 |
| Net Winter Capacity (MW) | 222.2 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Operating Month | 5 |
| Operating Year | 2018 |
| Status | (OP) Operating |
| Latitude | 39.465 |
| Longitude | -84.34778 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:17260 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:17259
Sources EV-eb16797f5201bffab4cc0f28Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7fe35e46b50722ad87b0257c1c7c333df0194a05396804f1b00e0007c83faafa
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:17260
Sources EV-c7e5a24a27a5df92642755caEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c7f2dd05fad31b41cf57d5127d1d67ba996b92077044135c98fc7ce07a519a00
Usage terms US government public domain
