United States of America · Generator · plant location

Little Elk Wind Project LLC / LEWP

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Enel Green Power NA, Inc.
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.194722, -98.90722

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Little Elk Wind Project LLC / LEWP

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)74 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1313150996cf552458886f90
Net Summer Capacity (MW)74 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1313150996cf552458886f90
Net Winter Capacity (MW)74 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-1313150996cf552458886f90
Detailed source fields
Original source fieldPublished value or condition
Entity ID59380
Entity NameEnel Green Power NA, Inc.
Plant ID58999
Plant NameLittle Elk Wind Project LLC
Google MapMap
Bing MapMap
Plant StateOK
CountyWashita
Balancing Authority CodeSWPP
SectorIPP Non-CHP
Generator IDLEWP
Nameplate Capacity (MW)74
Net Summer Capacity (MW)74
Net Winter Capacity (MW)74
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month12
Operating Year2015
Status(OP) Operating
Latitude35.194722
Longitude-98.90722
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:16904

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:16903

Sources EV-2a429aba95d256398c724620
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 eab1c029a434ad43adda6e40f15a60e79e00e80ddc24634039f8b519b8859f30

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:16904

Sources EV-1313150996cf552458886f90
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 71b073360308a421628e41356f8badf9c1373ac86b64cd7ec4850ff0ab320bef

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel