United States of America · Generator · plant location

Black Oak Wind Farm / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Black Oak Wind, LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
45.660833, -95.01278

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Black Oak Wind Farm / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)78 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-40135e0d9b6233dfc6c17697
Net Summer Capacity (MW)78 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-40135e0d9b6233dfc6c17697
Net Winter Capacity (MW)78 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-40135e0d9b6233dfc6c17697
Detailed source fields
Original source fieldPublished value or condition
Entity ID58625
Entity NameBlack Oak Wind, LLC
Plant ID58692
Plant NameBlack Oak Wind Farm
Google MapMap
Bing MapMap
Plant StateMN
CountyStearns
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)78
Net Summer Capacity (MW)78
Net Winter Capacity (MW)78
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month12
Operating Year2016
Status(OP) Operating
Latitude45.660833
Longitude-95.01278
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:16544

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:16543

Sources EV-daac11de83b5b3858d2477af
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d483d8fcd7904aa6edcc2ce81ca57a34a634d67c6dea63104409c10d6f8108db

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:16544

Sources EV-40135e0d9b6233dfc6c17697
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dbfb0479b283ca95eb424833604d99ebf9df50da7e1754dc15d7a101e38cbe36

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel