Irwindale Brew Yard, LLC / T200
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 5.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-c8c4c5a9017c0f05a26e6741 |
| Net Summer Capacity (MW) | 4.1 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-c8c4c5a9017c0f05a26e6741 |
| Net Winter Capacity (MW) | 4.7 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-c8c4c5a9017c0f05a26e6741 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 63952 |
| Entity Name | Irwindale Brew Yard, LLC |
| Plant ID | 58056 |
| Plant Name | Irwindale Brew Yard, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Los Angeles |
| Balancing Authority Code | CISO |
| Sector | Industrial Non-CHP |
| Generator ID | T200 |
| Nameplate Capacity (MW) | 5.2 |
| Net Summer Capacity (MW) | 4.1 |
| Net Winter Capacity (MW) | 4.7 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 2 |
| Operating Year | 2002 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 34.121667 |
| Longitude | -117.9383 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:15634 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:15633
Sources EV-6ba3e34ec24fbca0ac55b247Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d7d76020cd0066f13febe7fed36a56b5af2872adc5e54451c14bac79cfc63fba
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:15634
Sources EV-c8c4c5a9017c0f05a26e6741Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b00e32a2cc9e9dd3bf45749ba1f4941ec5170082920959a639804a6cd7285703
Usage terms US government public domain
