United States of America · Generator · plant location

FibroMont / G1

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Fibrowatt LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.369167, -79.73972

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

FibroMont / G1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)62 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-739f448fdacd2449de6326ba
Net Summer Capacity (MW)55 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-739f448fdacd2449de6326ba
Net Winter Capacity (MW)55 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-739f448fdacd2449de6326ba
Detailed source fields
Original source fieldPublished value or condition
Entity ID56029
Entity NameFibrowatt LLC
Plant ID57596
Plant NameFibroMont
Google MapMap
Bing MapMap
Plant StateNC
CountyMontgomery
Balancing Authority CodeCPLE
SectorIPP Non-CHP
Generator IDG1
Nameplate Capacity (MW)62
Net Summer Capacity (MW)55
Net Winter Capacity (MW)55
TechnologyOther Waste Biomass
Energy Source CodeAB
Prime Mover CodeST
Latitude35.369167
Longitude-79.73972
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:686

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:686

Sources EV-739f448fdacd2449de6326ba
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8b31ee3c9c0f43efa40ec6b5a25351bdc867419bbc50fb001aab7f8e6b619e35

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel